Non-Conformance Report (NCR) Template
November 27, 2026

An NCR records work that doesn't meet the specification and controls how it gets resolved. A good template makes sure every NCR captures what's needed — a clear description, an agreed disposition, and the corrective action tracked to close-out. Here's what an NCR template should contain. (For the how-to, see How to Write an NCR.)
Identification
- NCR number and date
- Project, location and element
- Raised by, and who it's assigned to
- Reference to the spec, drawing or standard not met
The non-conformance
- Clear, factual description of what doesn't conform
- The requirement it fails against
- Photo evidence
- Severity / classification
Disposition
The agreed route to resolution — typically one of:
- Rework / repair to meet the spec
- Use as-is (concession), with justification and approval
- Reject / replace
- Regrade to a different use
The disposition must be agreed by the right authority, not chosen by whoever raised it.
Corrective action and close-out
- Action taken and by whom
- Root cause, where it matters — see Root Cause Analysis for Construction Defects
- Verification the action worked
- Close-out date and sign-off
Close-out is what makes it real
An NCR left open proves nothing was fixed. The template's job is to force the loop closed — disposition agreed, action done, verified, signed off. This connects to the wider CAPA process.
Where SiteAudit fits
SiteAudit lets you raise NCRs from a template with photo evidence, record the agreed disposition, assign and track the corrective action, and capture verified close-out — so non-conformances are resolved and evidenced, not logged and left open.
Related articles
Get the Site Audit app
Capture issues, generate reports and finish audits faster — right from your phone.
Site Audit is a free construction site audit app for contractors — download the app or see pricing.